The City of Sedalia completed 76.8 blocks of chip and seal on Sedalia streets last week.

The following list provides the schedule for the week of July 24, 2017.

Motorists are encouraged to find alternate routes on the day work is scheduled for a specific street or plan additional time to arrive at their destination as period lane closures will occur as equipment and men are working on the streets.

Date: Mon., July 24, 2017
W. 18th St. between S. Limit Ave. and S. Moniteau Ave.
W. 20th St. between S. Grand Ave. and S. Ohio Ave.
E. 20th St. between S. Ohio Ave. and S. Lamine Ave.
S. Lamine Ave. between E. 16th St. and E. 20th St.

Date: Tues, July 25, 2017
W. 32nd St. from Highway B to the west City Limits
Highland Ave. between Southwest Blvd. and Skyline Dr.

Date: Wed., July 26, 2017
W. 28th St. from Jerome Dr. to S. Grand Ave.
Douglas Lane from S. Stewart Ave. to the dead end
Gregory Lane from W. 28th St. to S. Stewart Ave.
Jerome Dr. from W. 28th St. to Douglas Ln.
Keith Allen Dr. from W. 28th St. to Douglas Ln.
S. Quincy Ave. from W. 24th St. to W. 28th St.
S. Stewart Ave. from W. 24th St. to W. 28th St.
S. Stewart Ave. from W. 28th St. to W. 32nd St.

Date: Thurs., July 27, 2017
Buckingham Dr. from Downing Ln. to 32nd St.

Randy Kirby
Randy Kirby
loading...

More From AM 1050 KSIS