Street closure

27 Blocks in SE Sedalia to be Resurfaced
27 Blocks in SE Sedalia to be Resurfaced
27 Blocks in SE Sedalia to be Resurfaced
The City of Sedalia says in a media release the work is scheduled start Monday, August, 20, weather permitting. The area is bounded on the west by S. Massachusetts Ave., on the east by S. Ingram Ave., on the south by the City limits, and on the north by E. 24th Street.