![North Harding Crossing to Be Replaced](https://townsquare.media/site/468/files/2023/05/attachment-HardingMap.jpg?w=980&q=75)
North Harding Crossing to Be Replaced
On Friday, May 5 beginning at 6 a.m. and continuing through 6 p.m. on Saturday, May 6, Union Pacific Railroad will have a contractor replacing the crossing on North Harding Avenue between E. Broadway Boulevard (U.S. Highway 50) and East Harvey Street, which has failed.
The work will require North Harding Ave. to be closed to through traffic between East Broadway Blvd. (U.S. Highway 50) and E. Harvey Street. Traffic will need to find an alternate route to their destination during this period as Union Pacific has the crossing replaced.
The nearest roadway allowing crossing of the UP rail line from the North Harding job site is to the west at Emmett Ave.
![AM 1050 KSIS logo](https://townsquare.media/wp-content/uploads/2019/08/KSISAM.png?w=100)
The City apologized for any inconvenience the roadway closure may cause as UP and the City work to improve roadway surfaces in the area.
Please note that this project is weather and equipment dependent and may be delayed due to inclement weather or equipment breakdowns.
LOOK: Most dangerous states to drive in
More From AM 1050 KSIS
![Sedalia Notes Asphalt Overlay on South Ingram](http://townsquare.media/site/468/files/2024/07/attachment-Ingram-Road-Work.jpg?w=980&q=75)
![South Ingram Overlay Work Noted by City of Sedalia](http://townsquare.media/site/468/files/2024/07/attachment-Ingram1.jpg?w=980&q=75)
![Portion of South Center Closed Until August 1](http://townsquare.media/site/468/files/2024/07/attachment-Center.jpg?w=980&q=75)
![Stormwater Drainage Project Noted by Sedalia](http://townsquare.media/site/468/files/2024/07/attachment-Hancock.jpg?w=980&q=75)
![First Of Two New Squad Trucks Arrive In Sedalia](http://townsquare.media/site/468/files/2024/07/attachment-Squad-2.jpg?w=980&q=75)
![Stormwater Drainage Work at 28th & Quincy](http://townsquare.media/site/468/files/2024/07/attachment-28.jpg?w=980&q=75)
![Sedalia Notes Milling on Ingram This Week](http://townsquare.media/site/468/files/2024/07/attachment-Ingram.jpg?w=980&q=75)
![Washington Street Bridge Reopens To Northbound Traffic Only](http://townsquare.media/site/468/files/2024/07/attachment-BridgeOpen-1.jpg?w=980&q=75)
![City Notes Stormwater Work on East Broadway Starting July 15](http://townsquare.media/site/468/files/2024/07/attachment-Broadway.jpg?w=980&q=75)